Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost and Safety

Bentley’s New Cloud Services Offers Instant Insight on the Impact of Structural Design Changes on Project Schedule, Cost, and Safety

Bentley Systems announces the early access of Bentley’s Design Insights cloud service, a new extension of Bentley’s Scenario Services. Design Insights brings instant insight to the impact of design changes on the performance measures of organizations including project schedule, cost, and safety compliance.

Designers and engineers make hundreds of decisions in relative isolation, without fully understanding the impact of these decisions on other disciplines or downstream activities that influence project performance. Bentley’s Design Insights helps project teams make better-informed and more timely decisions that reduce cost overruns and unexpected project delays as insights into the project are gained much earlier.

Understand at a glance the ramification of change decisions on organizational and project performance metrics.

Design Insights utilizes the common digital engineering iModel created by users of Bentley’s AECOsim Building Designer, OpenPlant Modeler, RAM, STAAD, or Autodesk’s Revit™ to extract insights on key performance metrics for designers, owners, and project managers.

Bentley’s Design Insights enables:

  • Relative estimation of structural safety, cost, and schedule changes between design iterations
  • Heatmaps to identify areas of change between design iterations
  • Practical consideration of multiple design alternatives in parallel

Raoul Karp, Bentley’s VP of product development, analytical modeling, said, “Too often in today’s design world the true impact of important design decisions is not fully understood until construction is well underway. By providing designers, engineers, architects, and owners immediate insight into the downstream ramifications of decisions and tradeoffs to be made during design, team members can make better holistic decisions with the critical information at their fingertips.”




Review Article Be the first to review this article


Featured Video
Latest Blog Posts
Alex Carrick, Chief Economist at ConstructConnectThe AEC Lens
by Alex Carrick, Chief Economist at ConstructConnect
Canada Generates Jobs Creation Excitement in September
Jobs
Structural Engineer 2 (Engineer 2) for Los Alamos National Laboratory at Los Alamos,, New Mexico
Architect for Hutton at Wichita, Afghanistan
Structural Engineer for Kiewit at Lenexa, Kansas
Design Engineer (Engineer 1/2) for Los Alamos National Laboratory at Los Alamos,, New Mexico
GIS ANALYST I.8030200 for Dallas County at DALLAS, Texas
Failure Analysis Engineer for Flextronics at Milpitas, California
Upcoming Events
2020 Design-Build Conference & Expo! at Gaylord National Resort & Convention Center National Harbor MD - Oct 28 - 30, 2020
ABX | ArchitectureBoston Expo at Boston Convention & Exhibition Center Boston MA - Nov 4 - 5, 2020
Greenbuild 2020 at San Diego Convention Center San Diego CA - Nov 4 - 7, 2020
Kenesto: 30 day trial
Digital Cities
CADalog.com - Countless CAD add-ons, plug-ins and more.



© 2020 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise