All Categories : Case Studies Bookmark and Share

Title : HDR Tappan Zee Hudson River Crossing: The New New York Bridge, Bentley Systems
Company : Bentley Systems
Date : 30-Mar-2016
Downloads : 46



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

HDR was awarded the contract to design and build the new New York Bridge – which will replace the traffic-jammed Tappan Zee Bridge – on an aggressive schedule. In addition to crossing the Hudson River at one of its widest points, the design included twin tower cable-stayed main spans with 1,200-foot center spans, four traffic lanes, shoulders and emergency lanes, electronic tolling facilities, a shared-use path, and space for future mass transit. The owners also required an as-designed model and a complete, as-constructed database of assets derived from and tied to a 3D model
User Reviews More Reviews Review This File


Jobs
GIS Analyst for Horner & Shifrin at Poplar Bluff, Missouri
Upcoming Events
NFMT 2019 at Baltimore Convention Center Baltimore MD - Mar 26 - 28, 2019
AGC Equipment, Technology & Construction Solutions Expo at Colorado Convention Center Denver CO - Apr 1 - 3, 2019
BUILDINGSNY - 2019 at Javits Center New York City NY - Apr 2 - 3, 2019
Kenesto: 30 day trial
Bentley:
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2019 Internet Business Systems, Inc.
25 North 14th Steet, Suite 710, San Jose, CA 95112
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise