All Categories : Case Studies Bookmark and Share

Title : HDR Tappan Zee Hudson River Crossing: The New New York Bridge, Bentley Systems
Company : Bentley Systems
Date : 30-Mar-2016
Downloads : 47



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

HDR was awarded the contract to design and build the new New York Bridge – which will replace the traffic-jammed Tappan Zee Bridge – on an aggressive schedule. In addition to crossing the Hudson River at one of its widest points, the design included twin tower cable-stayed main spans with 1,200-foot center spans, four traffic lanes, shoulders and emergency lanes, electronic tolling facilities, a shared-use path, and space for future mass transit. The owners also required an as-designed model and a complete, as-constructed database of assets derived from and tied to a 3D model
User Reviews More Reviews Review This File

Jobs
Product Manager for Myomo, Inc. at Cambridge, Massachusetts
Esri Subject Matter Expert for GeoDecisions at New Orleans, Louisiana
Senior Civil Design Engineer for Cosmos at Pittsburgh, Pennsylvania
Upcoming Events
AIA Conference on Architecture 2019 at Las Vegas NV - Jun 6 - 8, 2019
ACCELERATE SYNCHRO Conference at Hilton Boston Logan Airport One Hotel Drive Boston MA - Jun 10, 2019
International Conference on Structures and Architecture (ICSA) 2019 at Calouste Gulbenkian Foundation Lisbon Portugal - Jul 24 - 26, 2019
SIGGRAPH 2019 at Los Angeles CA - Jul 28 - 1, 2019
Kenesto: 30 day trial
Bentley:
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2019 Internet Business Systems, Inc.
25 North 14th Steet, Suite 710, San Jose, CA 95112
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise