All Categories : Case Studies Bookmark and Share

Title : Gippsland Water Factory Alliance Uses AutoPLANT on Wastewater Treatment Facility
Company : Bentley Systems
Date : 27-Aug-2014
Downloads : 180



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Sustainable Wastewater Treatment Infrastructure Ends 60-year-old Environmental Disaster The (AUD) $260 million Gippsland Water Factory was designed to provide a sustainable and economically responsible solution. AutoPLANT, Bentley’s premier plant design engineering suite, helped to keep costs down by streamlining workflows, reducing design time, facilitating procurement, and producing as-built models for lifecycle asset management.
User Reviews More Reviews Review This File

Jobs
Esri Subject Matter Expert for GeoDecisions at New Orleans, Louisiana
Product Manager for Myomo, Inc. at Cambridge, Massachusetts
Senior Civil Design Engineer for Cosmos at Pittsburgh, Pennsylvania
Upcoming Events
AIA Conference on Architecture 2019 at Las Vegas NV - Jun 6 - 8, 2019
ACCELERATE SYNCHRO Conference at Hilton Boston Logan Airport One Hotel Drive Boston MA - Jun 10, 2019
International Conference on Structures and Architecture (ICSA) 2019 at Calouste Gulbenkian Foundation Lisbon Portugal - Jul 24 - 26, 2019
SIGGRAPH 2019 at Los Angeles CA - Jul 28 - 1, 2019
Kenesto: 30 day trial
Bentley:
CADalog.com - Countless CAD add-ons, plug-ins and more.



Internet Business Systems © 2019 Internet Business Systems, Inc.
25 North 14th Steet, Suite 710, San Jose, CA 95112
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise