All Categories : Case Studies Bookmark and Share

Title : ArcelorMittal Burns Harbor Operation Uses AssetWise Performance Management to Achieve USD 2.1 Million in Savings in One Year
Company : Bentley Systems
File Name : ArcelorMittal.PDF
Size : 770239
Type : application/pdf
Date : 30-Apr-2014
Downloads : 41



If download does not start, click here.
Rate This File
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

The ArcelorMittal USA Flat Roll Operations is comprised of 12 operating facilities employing over 17,000 people. The World Class Equipment Reliability (WCER) team at the ArcelorMittal Burns Harbor hot strip mill has achieved very dramatic results in a one-year period. Total savings in the first year were USD 2,076,900. Other positive benefits
User Reviews More Reviews Review This File
Featured Video
Latest Blog Posts
Alex Carrick, Chief Economist at ConstructConnectThe AEC Lens
by Alex Carrick, Chief Economist at ConstructConnect
The Math of Inflation and the Self-Correcting Base Level Effect
Jobs
CAD/BIM Specialist for LandDesign Inc. at Charlotte, North Carolina
ASIC Architects and Hardware Engineers at D. E. Shaw Research for D. E. Shaw Research at New York, New York
BIM Specialist - Architecture for Microdesk at Nashua, New Hampshire
Mechanical Engineer Advisor for Halliburton at Houston, Texas
Account Executive - ArcGIS Hub for ESRI at Redlands, California
GIS Technician for Sanborn at Colorado Springs, Colorado
Upcoming Events
Building Innovation 2022 at Mayflower Hotel MD - Sep 26 - 28, 2022
10th Annual Global EPC Summit London September 2022 at London, UK United Kingdom - Sep 28 - 30, 2022



© 2022 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise